Installation Made Simple

Installing an EV charging station involves electrical planning, compliance, and professional execution. At ePlug, we handle the entire process: from technical assessment to installation and documentation.

  • 1. Assessment

    We analyze your location and power availability

  • 2. Planning

    We design the electrical solution

  • 3. Installation

    Certified professionals execute the work

  • 4. Activation

    Testing, documentation, and go-live

What You’ll Need for AC & DC Charging

  • AC Charging (Home & Business)

    Ideal for residential and small commercial use, with power up to 22 kW. Easier installation with minimal infrastructure changes.


    Installation typically requires:

    • Dedicated circuit
    • RCD protection
    • Circuit breaker
    • Proper cable sizing
    • Grounding verification
  • DC Fast Charging (Public & Commercial)

    High-power charging stations for public infrastructure, requiring advanced electrical setup and grid connection.


    Installation typically requires:

    • High power grid connection
    • ATR approval required
    • Transformer (if needed)
    • Civil works (foundation, routing)
    • Load management systems

End-to-End Installation Services

ePlug provides complete EV charging solutions — from consultation to installation and documentation.

  • Site assessment
  • Equipment selection
  • Documentation preparation
  • Grid approvals (ATR)
  • Professional installation
  • Testing & commissioning
  • Ongoing support
Get Started

Legal Requirements & Documentation

Legal Requirements in Romania

EV charging stations must comply with national and European electrical standards, including SR EN 61851 and SR EN 62196.
Installation must be performed by ANRE-authorized electricians and may require approval from the local Distribution System Operator.

Technical Project

Electrical design and system planning for safe installation.

Load Calculation

Determines available power and system capacity.

Connection Approval (ATR)

Required for higher power installations or DC chargers.

Single-Line Diagram

Visual representation of the electrical system.

Commissioning Report

Confirms proper installation and functionality.